The Docking Project presented a complex mix of scopes, including electrochromic glazing by SageGlass integrated into Kawneer Clearwall 4-side SSG systems, alongside Kawneer System 2 with Viracon IGUs. The project also included interior all-glass systems, storefront, glazed guardrails, bullet-resistant assemblies, and specialty film applications—requiring precise coordination across multiple disciplines.

Project: Docking Building | General Contractor: Hutton | Aluminum: Kawneer | Electrochromic Glass: SageGlass | IGUs: Viracon | Fabrication: Ekos Manufacturing | Glass House: Sowards | President / Estimator / Project Manager: Josh Brady | Field Superintendent: Will Pitts

Previous
Previous

OLLIS

Next
Next

BMW of Columbia